ANALYSIS
Signals included Meta Muse Spark 1.2 / Muse Code and a K-U-M rank-3 mathematical result reported as Lean-verified. ASI remained 81% within 10 years.
Semantic review is behind discovery. Evidence and Pulse may be incomplete until the backlog is cleared.
2 material first-party/frontier/open-problem candidate(s) have waited more than 6 hours for semantic review.
Meta Muse Spark 1.2 / Muse Code and a Lean-verified mathematics result; no forecast change.
ANALYSIS
Signals included Meta Muse Spark 1.2 / Muse Code and a K-U-M rank-3 mathematical result reported as Lean-verified. ASI remained 81% within 10 years.